top of page

Fire Department Day Room Renovation

Manteno Fire Day Room_edited.png
Manteno Fire Day Room_edited.jpg
Manteno Fire Day Room_edited.jpg
IMG_4610_edited.jpg

Project Details: The Manteno Fire Protection District desired an updated day-room with improved finishes, lighting, and spatial usage within their existing Fire Department #1.  Utilization of low maintenance flooring that remains slip resistant when wet was of primary consideration.  Ceiling clouds were installed to better define the space, provide softening, provide better lighting, and reduce noise levels.  The day room was painted, and cabinetry upgraded to provide workstations for report writing.

Project Year: 2015

Location: Manteno, IL

Scope: Pre-Design, Design Development, Procurement & Construction Administration

About the Client: The Manteno Fire Protection District was established in 1948 protecting approximately 96 square miles and serves 12,000 residents. Manteno Fire has two stations located at 13 S Walnut St, Manteno and 501 Redwood St, Manteno.

Manteno Fire Day Room_edited_edited.jpg
Manteno Fire Day Room_edited.jpg
bottom of page